Board), of a sub-assembled
(e.g., an hybrid circuit that is placed on the
board) and of a component (e.g., a supplied integrated
circuit that is mounted on the sub-assembled).
In particular, let us assume that in the initial
plan the demand for 70 MPS units due in April