We thank you very much for your M&E comments. Please find below our responses to each of your comments.
Lighting point
1. All recessed down light provided with light fitting
---We will take action based on the comments that you offer.
2. All sign board light, wall light points only cable with connector, no light fitting
---We will take action based on the comments that you offer.
3. Suspended light shall provide points only with hook.
--- We will take action based on the comments that you offer.
4. All plaster ceiling area provided with down light, no T5 fitting.
--- We will take action based on the comments that you offer.
5. Store room provided with T5 (2 ft)
--- We will take action based on the comments that you offer.
6. Mezz flr void area shall have T5 tube inside light trough
--- We will take action based on the comments that you offer.
Small Power point
1. First floor power point mounting height is 1350mm
--- We will take action based on the comments that you offer.
2. 2nd floor onward power point height is 1200mm
--- We will take action based on the comments that you offer.
3. TV area at living room shall provide 3 nos power socket ( 800mm)(H)
--- We will take action based on the comments that you offer.
4. TV area at rooms shall provide 2 nos power socket ( 600mm )(H)
--- We will take action based on the comments that you offer.
5. Fridge - 1 no power socket, kitchen counter- 2 nos power socket
--- We will take action based on the comments that you offer.
6. For type SA, SE and SF , for 1st, Mezz and 2nd flr, power socket no need to provide at workstation, workstation is just for illustration. Only provide at wall or column as shown
--- We will take action based on the comments that you offer.
7. Glass window is full height, please check with architect, no power point at glass area.
--- We will take action based on the comments that you offer.
8. To provide single general power point rather than all twin socket outlet
--- We will take action based on the comments that you offer.
9. Instant water Heater point c/w connector shall be provided at every toilet with shower. No 15A socket outlet is required.
--- We will take action based on the comments that you offer.
10 Air conditioning points provided with connector only, no 15A socket outlet is required.
--- We will take action based on the comments that you offer.
Exhaust fan
1. To provide ducted exhaust fan at toilet and discharge to the water pipe riser
--- We will take action based on the comments that you offer.
2. Exhaust fan loop from light switch. Means toilet light and exhaust fan under one switch.
--- We will take action based on the comments that you offer.
DB
1. For type SB to SD, there shall be 2 DBs at first floor. The DB behind shall be supply from the main DB at front shop. The back portion of the shop may be rented out, that wise separate DB.
---We disagree If the median rent should the customer is operated.
2. All DB shall placed in front of the shop.
---We'll not agree because the architecture is not appropriate.
3. The wall for main DB mounting shall have brick extended 400mm from the end column. The thickness of the wall include plastering is roughly 230mm. Therefore main DB can be mounted back to back and recessed in.
---We'll not agree because the architecture is not appropriate.
4. DB shall not be located at mid landing staircase.
--- We will take action based on the comments that you offer.
5. No water pump for suction and roof distribution is required to provide, purchaser will buy themselves.
---We'll show and note in drawing, provided purchases by customer later.
TV, TEL, and Computer point
1. TV provided at every room and living room, and kitchen
--- We will take action based on the comments that you offer.
2. TEL points shall be provided as shown in our commented drawing. No need to provide for workstation and office area.
--- We will take action based on the comments that you offer.
3. Computer point – Not required
--- We will take action based on the comments that you offer.
4. MATV splitter box shall be provided at entrance door above the DB area
---We'll not agree because the architecture is not appropriate.
5. Tel distribution panel shall be provided at entrance door above the DB area.
---We'll not agree because the architecture is not appropriate.
Fire Alarm System
1. No need to provide for shop houses
--- We will take action based on the comments that you offer.
Cold water plumbing
1. No pump to be provided. However valve should be provided for purchaser to connect in future.
---We'll show and note in drawing, provided purchases by customer later.
2. What water pipe material is used, please specify.
---We'll determine, in the specification.
ACMV Services
Air Cond
– Drain pipe to connect to nearest floor trap/floor drain instead having centralize dropper.
---We'll not agree because the architecture is not appropriate.
– To box-up the refrigerant and drain dropper pipe
---We'll not agree because the architecture is not appropriate.
– Refrigerant pipe length too long. More than 20m. To follow manufacturer recommendation on the pipe length on each air cond capacity.
---We design according to the architecture
– Cassette type air conditioner location will crash with ceiling fan point?
---We design according to the architecture
– Can the air cond ledge fit the CDU by stacking 3 nos in stack form? And does the ledge can fit in all the CDU?
---We will continue to monitor the comments.
– To justify the air conditioner capacity by calculation
---We will continue to monitor the comments.
Mech Ventilation
– What is the air change rate design for toilet?
---We will continue to monitor the comments.
GENERAL
1. Please provide schedule of points or fittings for every type. To be used for sales and purchase agreement (SPA).
2. Please coordinate with architecture layout, especially where there is glass area, full height glass or half height glass. Many power point are indicated at glass area.
3. All points shall be indicate on wall, do not just indicate at the table or workstation, where it is just for illustration.
For M&E system we will get your request done by the next meeting time.
เราขอบคุณมากสำหรับ M & E แสดงความคิดเห็น กรุณาหาด้านล่าง การตอบสนองของเรากับแต่ละความคิดเห็นของคุณ .
แสงจุด
1 โคมดาวน์ไลท์ทั้งหมดให้กับ --- แสงพอดี
เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
2 ทุกป้ายไฟ , ไฟผนังจุดเชื่อมต่อสายเคเบิลเดียวด้วย ไม่มีแสงพอดี
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
3แขวนไฟให้จุดเดียวเบ็ด
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
4 ทุกพื้นที่ให้กับฝ้าฉาบลงไฟ T5 ไม่กระชับ
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
5 ห้องเก็บให้กับ T5 ( 2 ฟุต )
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
6พื้นที่เป็นโมฆะ mezz FLR จะมีท่อภายในรางไฟ T5
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ จุดพลังเล็กๆ
1 จุดชั้นพลังงานติดตั้งความสูง 1350mm
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
2 ชั้น 2 เป็นต้นไป จุดพลังสูงเป็น 1200mm
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
3พื้นที่ทีวีที่ห้องนั่งเล่นจะให้ 3 ไม่มีช่องเสียบไฟ ( 800 มม. ) ( H )
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
4 ทีวี พื้นที่ห้องจะให้ 2 ไม่มีช่องเสียบไฟ ( 600mm ) ( H )
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
5 ตู้เย็น - 1 ไม่มีไฟซ็อกเก็ต , ชุดครัว - 2 หมายเลขซ็อกเก็ตไฟ
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
6สำหรับประเภทซา เซและ SF , 1 และ ชั้น 2 mezz , ช่องเสียบไฟไม่ต้องให้เวิร์กสเตชัน Workstation เป็นเพียงภาพประกอบ เพียงให้ที่คอลัมน์ผนังหรือแสดง
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
7 หน้าต่างกระจกสูงเต็ม โปรดตรวจสอบกับสถาปนิก ชี้ไม่มีอำนาจที่บริเวณกระจก
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
8เพื่อให้จุดพลังทั่วไปเดียวมากกว่าแฝดเต้ารับ
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
9 ทันทีเครื่องทำน้ำอุ่นจุด C / W ต่อจะให้ทุกห้องน้ำที่มีฝักบัว ไม่มี 15A เต้ารับจะต้อง
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
10 เครื่องปรับอากาศจุดให้เชื่อมต่อเท่านั้นไม่มี 15A เต้ารับจะต้อง
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
ไอเสียแฟน
1 เพื่อให้ท่อไอเสียพัดลมที่ห้องน้ำและปล่อยให้น้ำท่อไรเซอร์
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
2 รอบพัดลมจากสวิทช์แสง หมายถึงไฟห้องน้ำและไอเสียพัดลมใต้สลับ .
--- เราจะดำเนินการตามความเห็นที่คุณเสนอ .
)
1 สำหรับประเภทของ SB เพื่อ SD , จะมี 2 ดีบี ที่พื้นก่อน ฐานข้อมูลที่อยู่เบื้องหลังจะต้องจัดหาจากฐานข้อมูลหลักที่ร้านหน้า ส่วนด้านหลังของร้านอาจจะเช่า ที่ปัญญาแยกฐานข้อมูล
--- เราไม่เห็นด้วย ถ้าค่าเช่าเฉลี่ยควรลูกค้าเป็นผู้ดำเนินการ .
2 ทั้งหมด DB จะอยู่ในด้านหน้าของร้าน
--- เราก็ไม่เห็นด้วย เพราะเป็นสถาปัตยกรรมที่ไม่เหมาะสม
3 ผนังสำหรับการติดตั้งฐานข้อมูลหลักจะอิฐขยาย 400 จากท้ายคอลัมน์ ความหนาของผนังฉาบปูน รวมเป็นประมาณ 230mm . ดังนั้นฐานข้อมูลหลักสามารถติดตั้งกลับไปกลับและปิดภาคเรียนใน .
--- เราก็ไม่เห็นด้วย เพราะเป็นสถาปัตยกรรมที่ไม่เหมาะสม .
4 DB จะอยู่ที่กลางบันได
ลง .--- เราจะดำเนินการตามความเห็นที่คุณเสนอ .
5 ไม่มีน้ำ ปั๊มสำหรับดูดและจำหน่ายหลังคาต้องให้ ผู้ซื้อ จะซื้อเอง
--- เราจะแสดงและบันทึกในการวาดภาพ ให้ซื้อ โดยลูกค้าในภายหลัง
ทีวี , โทรศัพท์ , คอมพิวเตอร์ และจุด
1 ดูทีวีให้ทุกห้องและห้องนั่งเล่นและครัว
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
2จุดที่เราจะให้แสดงความเห็นในแบบ ไม่ต้องให้เวิร์กสเตชันและพื้นที่สำนักงาน
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
3 จุดและคอมพิวเตอร์ไม่ต้อง
--- เราจะดำเนินการตามข้อคิดเห็นที่คุณเสนอ .
4 รวมแยกกล่องจะให้ไว้ที่ประตูทางเข้า เหนือพื้นที่ dB
--- เราก็ไม่เห็นด้วย เพราะเป็นสถาปัตยกรรมที่ไม่เหมาะสม .
5 การกระจายเป็นแผงจะให้ไว้ที่ประตูทางเข้า เหนือพื้นที่ dB .
--- เราก็ไม่เห็นด้วย เพราะเป็นสถาปัตยกรรมที่ไม่เหมาะสม ระบบเตือนภัยไฟ
1 ไม่ต้องให้ --- บ้าน
ร้านเราจะดำเนินการตามความเห็นที่คุณเสนอ .
น้ำเย็นท่อ
1 ปั๊มไม่มีจะให้อย่างไรก็ตามวาล์วให้ผู้ซื้อเพื่อเชื่อมต่อในอนาคต
--- เราจะแสดงและบันทึกในการวาดภาพ ให้ซื้อ โดยลูกค้าในภายหลัง .
2 อะไรวัสดุท่อ น้ำใช้ โปรดระบุ .
--- เราจะกำหนดในข้อกำหนด .
acmv บริการแอร์– drain ท่อที่จะเชื่อมต่อใกล้พื้นกับดัก / ท่อระบายน้ำชั้นแทนการใช้หยด
--- เราก็ไม่เห็นด้วย เพราะเป็นสถาปัตยกรรมที่ไม่เหมาะสม และกล่องขึ้น
และระบายน้ำหยดท่อสารทำความเย็น --- เราก็ไม่เห็นด้วย เพราะเป็นสถาปัตยกรรมที่ไม่เหมาะสม และความยาวท่อสารทำความเย็น
นานเหมือนกัน มากกว่า 20 เมตร ตามผู้ผลิตแนะนำในความยาวท่อในแต่ละแอร์ความจุ
---
เราออกแบบตามสถาปัตยกรรม- ชนิดเทปแอร์ตำแหน่งจะผิดพลาดด้วยจุดพัดลมเพดาน ?
--- เราออกแบบตามสถาปัตยกรรม
–สามารถแอร์หิ้งพอดี CDU โดยซ้อน 3 NOS ในกองฟอร์ม และทำหิ้งสามารถพอดีใน CDU ?
--- เราจะตรวจสอบความคิดเห็น .
) เพื่อปรับแอร์ความจุโดย --- การคำนวณ
เราจะยังคงติดตามความคิดเห็น
กลไกการระบาย
–อะไรอากาศเปลี่ยนแปลงอัตราสำหรับการออกแบบห้องน้ำ
--- เราจะยังคงติดตามความคิดเห็น
ทั่วไป
1 โปรดให้ตารางคะแนนหรืออุปกรณ์ทุกประเภท ที่จะใช้สำหรับการขายและสัญญาซื้อขาย ( สปา )
2 กรุณาประสานงานกับรูปแบบสถาปัตยกรรม โดยเฉพาะอย่างยิ่งเมื่อมีพื้นที่ แก้ว หรือ แก้วเต็มความสูงความสูงครึ่งหนึ่งจุดพลังมากจะพบบริเวณกระจก
3 ทุกจุดจะพบบนผนังที่ไม่เพียงระบุที่ตารางหรือเวิร์กสเตชัน ซึ่งมันเป็นเพียงภาพประกอบ
m &ระบบ e เราจะได้รับการร้องขอให้เสร็จตามเวลา
การประชุมครั้งต่อไป
การแปล กรุณารอสักครู่..