(g) Road and Box Culvert:
Road Construction;
(a) The roads that the Contractor shall construct within the Contractor’s Working Area, at its sole cost and expense, shall transfer to the Employer upon termination of this Agreement is the road around the perimeter of each bench dump and/or the connection route between each dumping bench as stipulated by the Employer in the Work Plan. The Contractor shall construct these roads strictly in accordance with the specifications, gradient and width specified by the Employer. The Employer may request the Contractor to cover the surface of such road with non-slip materials such as aggregate, laterite, etc. at the Employer's expenses.
(b) In the event that road construction is likely to affect the drainage system as specified in the Work Plan, the Contractor shall submit a remedy plan to the Employer for its prior written approval.