Buakham said the construction begun a little later than they had expected as the contractor has to import several pieces of equipment and materials. A survey is currently being conducted to assess the possible impact to existing utilities and residential properties such as power grids, telephone posts and agricultural lands, he said.According to Buakham, the existing 3-metre wide roads would be expanded to 7 metres.