• Yp (the “primary” or “performance” or “economic” variables) is “the set of process variables that define the product and process specifications as well as process constraints”
• Yd is the set of dynamically measured process variables
• Ycd (a subset of B) is the “set of process variables on which we base our dynamic control strategy”
• Ud is the dynamic input variables