Test shall always be carried out whenever there is a change of condition (e.g. change of packaging material supplier, failed test on material), new/changed/updated packaging solution (e.g. material, dimension, construction), or change in process parameters (e.g. new equipment). As a minimum, all tests shall always be renewed within 12 months.