1. IntroductionOne of the key assumptions of the basic economic order  การแปล - 1. IntroductionOne of the key assumptions of the basic economic order  ไทย วิธีการพูด

1. IntroductionOne of the key assum

1. Introduction

One of the key assumptions of the basic economic order quantity (EOQ) model is that the items received are of perfect quality. However, product quality is not always perfect but is directly affected by the reliability of the production process used. Therefore, the process may deteriorate and produce defectives or poor quality items. Porteus (1986) introduced a model that shows a significant relationship between quality and lot size. He incorporated the effect of defective items into the basic EOQ model and introduced the option for investing in process quality improve-ment by means of reducing the probability that the process moves out of control. Lee and Rosenblatt (1987) addressed the problems of joint control of production cycles or manufacturing quantities, and maintenance by inspections. They solved the problem of simultaneous determination of economic manufactur-ing quantity (EMQ) and the inspection schedule by using an approximation method to the cost function. They also examined the cost penalties of using the classical EMQ and the effects of different parameters of the system on the magnitude of these penalties. Schwaller (1988) extended the EOQ model by adding the assumptions that defective items of a known proportion were present in incoming lots and that fixed and variable inspection costs were incurred in finding and removing these defective items. It was also assumed that the supplier reimbursed the buyer for any defective items found and removed. Cheng (1991)
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
1. IntroductionOne of the key assumptions of the basic economic order quantity (EOQ) model is that the items received are of perfect quality. However, product quality is not always perfect but is directly affected by the reliability of the production process used. Therefore, the process may deteriorate and produce defectives or poor quality items. Porteus (1986) introduced a model that shows a significant relationship between quality and lot size. He incorporated the effect of defective items into the basic EOQ model and introduced the option for investing in process quality improve-ment by means of reducing the probability that the process moves out of control. Lee and Rosenblatt (1987) addressed the problems of joint control of production cycles or manufacturing quantities, and maintenance by inspections. They solved the problem of simultaneous determination of economic manufactur-ing quantity (EMQ) and the inspection schedule by using an approximation method to the cost function. They also examined the cost penalties of using the classical EMQ and the effects of different parameters of the system on the magnitude of these penalties. Schwaller (1988) extended the EOQ model by adding the assumptions that defective items of a known proportion were present in incoming lots and that fixed and variable inspection costs were incurred in finding and removing these defective items. It was also assumed that the supplier reimbursed the buyer for any defective items found and removed. Cheng (1991)
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
1. Introduction

One of the key assumptions of the basic economic order quantity (EOQ) model is that the items received are of perfect quality. However, product quality is not always perfect but is directly affected by the reliability of the production process used. Therefore, the process may deteriorate and produce defectives or poor quality items. Porteus (1986) introduced a model that shows a significant relationship between quality and lot size. He incorporated the effect of defective items into the basic EOQ model and introduced the option for investing in process quality improve-ment by means of reducing the probability that the process moves out of control. Lee and Rosenblatt (1987) addressed the problems of joint control of production cycles or manufacturing quantities, and maintenance by inspections. They solved the problem of simultaneous determination of economic manufactur-ing quantity (EMQ) and the inspection schedule by using an approximation method to the cost function. They also examined the cost penalties of using the classical EMQ and the effects of different parameters of the system on the magnitude of these penalties. Schwaller (1988) extended the EOQ model by adding the assumptions that defective items of a known proportion were present in incoming lots and that fixed and variable inspection costs were incurred in finding and removing these defective items. It was also assumed that the supplier reimbursed the buyer for any defective items found and removed. Cheng (1991)
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
1 . บทนำ

หนึ่งของสมมติฐานที่สำคัญของคำสั่งพื้นฐานทางเศรษฐกิจปริมาณ ( EOQ ) รุ่นที่ได้รับสินค้าที่มีคุณภาพที่สมบูรณ์แบบ อย่างไรก็ตาม คุณภาพของผลิตภัณฑ์ที่ไม่ได้เสมอที่สมบูรณ์แบบ แต่ได้รับผลกระทบโดยตรงจากความน่าเชื่อถือของกระบวนการผลิตที่ใช้ ดังนั้น กระบวนการผลิต กระบวนการผลิต และอาจเสื่อมสภาพหรือรายการที่มีคุณภาพไม่ดีporteus ( 1986 ) แนะนำรุ่นที่ signi จึงไม่สามารถแสดงความสัมพันธ์ระหว่างคุณภาพและขนาดมาก เขารวมผลของรายการที่มีข้อบกพร่องในแบบจำลอง EOQ เบื้องต้นและแนะนำทางเลือกสำหรับการลงทุนในกระบวนการปรับปรุงคุณภาพ ment โดยวิธีการลดโอกาสที่กระบวนการย้ายออกจากการควบคุมลีและ Rosenblatt ( 1987 ) แก้ไขปัญหาของการควบคุมร่วมกันของรอบการผลิตหรือปริมาณการผลิตและการบำรุงรักษา โดยการตรวจสอบ พวกเขาแก้ปัญหาการพร้อมกันผลิตทางเศรษฐกิจปริมาณไอเอ็นจี ( ปิ่น ) และการตรวจสอบตารางโดยใช้การประมาณวิธีฟังก์ชันต้นทุนพวกเขายังตรวจสอบต้นทุนการลงโทษโดยใช้ปิ่นคลาสสิกและผลของตัวแปรต่างๆของระบบในขนาดของการลงโทษเหล่านี้schwaller ( 1988 ) นำโดยการเพิ่มขยายแบบจำลองสมมติฐานที่สินค้าที่บกพร่องของรู้จักสัดส่วนอยู่มากมายที่เข้ามา และนั่นจึง xed และค่าใช้จ่ายที่เกิดขึ้นในการตรวจสอบตัวแปรอยู่จึงหาและลบรายการที่มีข้อบกพร่องเหล่านี้ นอกจากนี้ยังสันนิษฐานว่า ซัพพลายเออร์ reimbursed ผู้ซื้อสำหรับสินค้าที่บกพร่องที่พบและลบออก เฉิง ( 2534 )
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.

Copyright ©2024 I Love Translation. All reserved.

E-mail: