to maintain material continuity in the base
layer. Figure 4.10 depicts an excavated strain gauge and pressure cell array. It is
important to note that all the cable trenches extended ‘upstream’ into the direction of
traffic. Given that moving traffic would tend to push the pavement as it approached a
gauge, this arrangement should minimize damage to the cable/sensor connection by
providing strain relief.