The problem from the hotel has changed the system of individual hot boiler to heat pump so Plan don’t want to redesign because hotel not follow his plan then We have to use the supplier to compute all system of heat pump and propose to Khun Kiatisak to approve it as We are doing now and let Pathom to design all hot tube in the hotel building as We are solve this matter.