The Murphy County Fire Department is considering
two options for upgrading its aging physical facilities.
Plan A involves remodeling the fire stations
on Alameda Avenue and Trowbridge Boulevard that
are 57 and 61 years old, respectively. (The industry
standard is about 50 years of use for a station.) The
cost for remodeling the Alameda station is estimated
at $952,000 while the cost of redoing the
Trowbridge station is $1.3 million. Plan B calls for
buying 5 acres of land somewhere between the two
stations, building a new fi re station, and selling the
land and structures at the previous sites. The cost of
land in that area is estimated to be $366,000 per
acre. The size of the new fi re station would be 9000
square feet with a construction cost of $151.18 per
square foot. Contractor fees for overhead, profi t,
etc. are expected to be $340,000, and architect fees
will be $81,500. (Assume all of the costs for plan B
occur at time 0.) If plan A is adopted, the extra cost
for personnel and equipment will be $126,000 per
year. Under plan B, the sale of the old sites is anticipated
to net a positive $500,000 five years in the
future. Use an interest rate of 6% per year and a 50-
year useful life for the remodeled and new stations
to determine which plan is better on the basis of a
present worth analysis.
The Murphy County Fire Department is consideringtwo options for upgrading its aging physical facilities.Plan A involves remodeling the fire stationson Alameda Avenue and Trowbridge Boulevard thatare 57 and 61 years old, respectively. (The industrystandard is about 50 years of use for a station.) Thecost for remodeling the Alameda station is estimatedat $952,000 while the cost of redoing theTrowbridge station is $1.3 million. Plan B calls forbuying 5 acres of land somewhere between the twostations, building a new fi re station, and selling theland and structures at the previous sites. The cost ofland in that area is estimated to be $366,000 peracre. The size of the new fi re station would be 9000square feet with a construction cost of $151.18 persquare foot. Contractor fees for overhead, profi t,etc. are expected to be $340,000, and architect feeswill be $81,500. (Assume all of the costs for plan Boccur at time 0.) If plan A is adopted, the extra costfor personnel and equipment will be $126,000 peryear. Under plan B, the sale of the old sites is anticipatedto net a positive $500,000 five years in thefuture. Use an interest rate of 6% per year and a 50-year useful life for the remodeled and new stationsto determine which plan is better on the basis of apresent worth analysis.
การแปล กรุณารอสักครู่..
เมอร์ฟี่มณฑลดับเพลิงจะพิจารณา
สองตัวเลือกสำหรับการอัพเกรดสิ่งอำนวยความสะดวกทางกายภาพของริ้วรอย.
แผนเกี่ยวกับการปรับปรุงสถานีดับเพลิง
ในการเดินเล่นถนนสายหลักและถนน Trowbridge ที่
57 และ 61 ปีตามลำดับ (อุตสาหกรรม
มาตรฐานคือประมาณ 50 ปีของการใช้สถานี.)
ค่าใช้จ่ายสำหรับการปรับปรุงสถานีเดินเล่นอยู่ที่ประมาณ
$ 952,000 ในขณะที่ค่าใช้จ่ายของ redoing
สถานี Trowbridge เป็น $ 1,300,000 แผน B เรียกร้องให้มี
การซื้อ 5 ไร่ของที่ดินที่อยู่ระหว่างทั้งสอง
สถานีสร้างสถานีใหม่สายใหม่และการขาย
ที่ดินและสิ่งปลูกสร้างที่เว็บไซต์ก่อนหน้านี้ ค่าใช้จ่ายของ
ที่ดินในพื้นที่ที่คาดว่าจะ $ 366,000 ต่อ
เอเคอร์ ขนาดของสถานีใหม่ไฟใหม่จะเป็น 9,000
ตารางฟุตที่มีค่าใช้จ่ายในการก่อสร้างของ $ 151.18 ต่อ
ตารางฟุต ค่าธรรมเนียมเหมาสำหรับค่าใช้จ่ายกำา,
ฯลฯ ที่คาดว่าจะได้รับ $ 340,000 และค่าธรรมเนียมสถาปนิก
จะเป็น $ 81,500 (สมมติว่าค่าใช้จ่ายทั้งหมดสำหรับแผน B
เกิดขึ้นในเวลา 0) ถ้าทำตามแผนจะนำค่าใช้จ่ายเพิ่มเติม
สำหรับบุคลากรและอุปกรณ์ที่จะได้รับ $ 126,000 ต่อ
ปี ภายใต้แผน B, การขายของเว็บไซต์เก่าเป็นที่คาด
สุทธิบวก $ 500,000 ห้าปีใน
อนาคต ใช้อัตราดอกเบี้ย 6% ต่อปีและ 50
ปีอายุการใช้งานสำหรับสถานีออกแบบและใหม่
เพื่อตรวจสอบว่าแผนจะดีกว่าบนพื้นฐานของ
การวิเคราะห์มูลค่าปัจจุบัน
การแปล กรุณารอสักครู่..