Item 1 and 4: From our inspection, we found that fiberglass roof, which has a length of 18 m. was blown off the roof in the height building. Therefore, contractor had to include the risk of the roof repair, labour, material and equipment in these items and we were prepared to accept that the cost claim was reasonable.
Item 2 and 3: The costing of the repair work without the material, we have been informed by the insured that there was water flowing down, when a strong wind damaged the roof of the building but not blown away form the premises. So it must be shoot nut and silicone to prevent water leak into a property below were found to be acceptable.
Item 7:
After we checked the quantity damage claimed which we had inspected during our site inspection. As a result, we accepted that the cost, which had been claimed were as had been agreed and therefore the quality could be accepted without adjustment.
In respect of the unit cost of replacement, on checking the supporting document and after we had made market enquiries we were prepared to accept that the unit costs claimed were reasonable.
Item 5: This claim relates to the repairing the canvas which damaged due to the strong wind, we noted that the canvas for particular stock, then we deduct the risk from the claim amount.
Item 6: We found the T bar ceiling in the canteen was out of the original position. The causes of the strong winds came and make its corrupt. The Insured claim on the part of the ceiling to arrange and some repairs, we carefully checked the scope and compared the details of the labour cost and found that the cost could be accepted as being standard cost of the supplier; hence, we accepted this without adjustment.
Item 1 and 4: From our inspection, we found that fiberglass roof, which has a length of 18 m. was blown off the roof in the height building. Therefore, contractor had to include the risk of the roof repair, labour, material and equipment in these items and we were prepared to accept that the cost claim was reasonable.Item 2 and 3: The costing of the repair work without the material, we have been informed by the insured that there was water flowing down, when a strong wind damaged the roof of the building but not blown away form the premises. So it must be shoot nut and silicone to prevent water leak into a property below were found to be acceptable. Item 7: After we checked the quantity damage claimed which we had inspected during our site inspection. As a result, we accepted that the cost, which had been claimed were as had been agreed and therefore the quality could be accepted without adjustment. In respect of the unit cost of replacement, on checking the supporting document and after we had made market enquiries we were prepared to accept that the unit costs claimed were reasonable. Item 5: This claim relates to the repairing the canvas which damaged due to the strong wind, we noted that the canvas for particular stock, then we deduct the risk from the claim amount.Item 6: We found the T bar ceiling in the canteen was out of the original position. The causes of the strong winds came and make its corrupt. The Insured claim on the part of the ceiling to arrange and some repairs, we carefully checked the scope and compared the details of the labour cost and found that the cost could be accepted as being standard cost of the supplier; hence, we accepted this without adjustment.