There seem to be limited research reported on the methodological aspects of developing contract award criteria (Soudry, 2004). Discussions about how to set up the whole interrelated system of technical, capability and suitability requirements as required by law are fairly simple. Piga and Zanza (2004) do touch on the problem but only lists a few solutions applied without any discussion of their applicability or related issues.