The adjustment to the exporting bandwidth capacity to the main grid from 10 MW during the SREP to 30 MW in the FiT is another important element that is expected to stimulate a wide
range entry of enterprises ranging from small businesses with small budgets and limited capability to major entrepreneurs [6].