• Designing the dcm for bl1-1w at slri.
• Assembling the dcm.
• Factory inspection.
• Packing for shipping.
• Deliverying dcm from kohzu head office in japan to suvannabhumi airport in Thailand.
• Unpacking the dcm at slri.
• Re-assembling the dcm (during shipping dcm is disassembled).
• On-site mechanical installation of the dcm.
• Connecting electrical cables between dcm and motor controller.
• Connecting water circulation tube.
• On-site inspections.