Achievement of construction of low medium cost housing in Kuala Lumpur
during Seventh Malaysia Plan was also the lowest with only 27.3% compared
to medium (233.7%) and high cost (749.6%). The construction of low medium
cost housing only started in 1998 (refer to Table 7).