BUILDING CONSTRUCTION CONTRACT
This contract is made at_____________________________________________________
On this day of_______________________2008. A.D
Between_______________________________________________________________________________________________________________________________________________
Hereinafter referred to as the “Employer“one party.
And___________________________________________________________________________________________________________________________________________________
Hereinafter referred to as the “Contractor“another party
Both parties agrees to the following terms and provisions.
Clause 1. The Employer agrees to hire and the Contractor agrees to be hired to
Construct one house, one lower apartment and pool, carport and sala on a part of
Land designated by _____________Nr book no_______________
Page land plot Nr aeries Rai Sq
Located at Klong Jark Bay, Koh Lanta Yai sub-district Koh Lanta district, Krabi province
And to be completed within ____________days from signing date according to plans,
Specifications and schedules attached hereto, which will be deemed a part of this contract
Clause 2. The construction and the building will be built as per contract drawing
and shop drawing and it includes electricity, water tap piping, painting works besides.
Clause 3. The parties agree to the cost of construction for the total sum of
_________________________Baht (_________________) in lump sum price included
materials labor costs and tax, but it does not include any fees for other relevant licences.
(See Appendix time schedule and payment plan)
Clause 4. The contractor shall provide all tools and equipment required for construction
work and shall recruit labours with good workmanship
Clause 5. The Contractor shall provide all materials to be used in construction works as per
lists of material attached hereto, and agrees to be liable for electricity bills, water supply
bills needed for construction of its employees.
Signed Employer Signed Contractor
-2-
Clause 6. The Employer shall alter, add or cut any lists of material provide other
material or accessory by means of writing notice submitted to the Contractor
within 15 days in advance, save and except the change of products, that the Contractor
provides instead of them with same qualities.
Clause 7. The Employer shell pay the cost within the 5 days of the payment plan and
shall detain 3 percent of each payment every time, and withholding tax.
Such detainment will be returned without interest to the Contractor within 1 year
commencing on the final delivery as a guarantee of work, if not any damages occurs.
Clause 8. In case the Employer desires to correct, alter or add the plan or specification of house or building, it is subject to inform the Contractor in writing in advance at least 15 days, and the Employer shall pay for an increase.
Clause 9. The Employer or his agent has a permission to inspect the construction site every day at an appropriate time, but agrees not to obstruct or disturb the work.
Clause 10. The Employer or his agent shall examine the completion of work within 5 days from the date of notice receipt made by the Contractor. Should there be no action within the limit of time it will be regarded the hand over is approved indirectly.
Signed Employer Signed Contractor
-3-
Clause 11. The Contractor has permission to take a part of work in this contract to hire other subcontractors, thereby the Contractor shall be responsible or the work as if he commits it directly.
Clause 12. The Contractor shall take responsibility for any perils arising directly or indirectly from faults in construction work hereof and compensate damages to the victims.
The contractor shall arrange for hygienic control and always maintain the environment in the construction site and surrounding area to be clean.
In the event the construction will be delayed or stopped by the reason of force ma-jeure, the Employer agrees to expand the schedule in equal to the missing period of the Contractor caused by such said event.
In case the Employer fails to pay construction cost at any terms, the Contractor shall be able to terminate this contract promptly.
Clause 13. Should any party fails to comply with any clause hereof the other party shall have right to terminate this contract immediately.
Clause 14. In case the Contractor delays the hand over of the Contractor entire construction work, the Employer is able to charge money penalty 20,000 Baht per day as per agreed schedule. And if there are any other damages occurred by such delay, the Contractor is subject to compensate it to the Employer.
Clause 15. If the contractor don not fulfil, in any terms of, quality required from the employer. The employer has the right to terminate the contract and withhold the money regarding the specific work.
This contract is made in duplicate contained identical terms and provisions. The parties have read and understood it thoroughly, hence sign their names as a testimony be form the witnesses and each party keeps one copy.
Signed The Employer Signed The Contractor
(…………………………….) (......................................)
Signed Witness Signed Witness
(……………………………..) (…………………………)