You must take into consideration the size pipe cleaners
first. PIPE DIAMETER diameter of pipe cleaners
2. PIPE LENGTH piping length
3. NUMBER OF FITTINGS number of joints such as elbows
4. FLUID VELOCITY movement speed of the refrigerant
piping should use the manual installation of air conditioning is on. I do not know if it can find. A rough diagram Sizing piping which generally determine the pressure drop across the suction side (Suction Line Pressure Drop) 2 PSI / 100 FT and pressure drop across the transmitter side (Discharge Line PressureDrop) 4 PSI / 100 FT.
Besides. Choose the correct size of pipe cleaners. The piping must also be made more cheaply principles. With so keep the machine running efficiently, such as pipe cleaners to clean the well. Dry and in the piping must take into account the speed of the vapor liquid enough to take the oil. Back with compressor So, to install condensers, as Leasing and Eva operator in Different. Regardless of
one. Installing Eva as operator under condensers, Lansing. Will have little effect because the oil back into the compressor. Compressors are higher The suction pipe must take into account the pressure drop and oil with
2 to install condensers, as Leasing under Eva operator. As a result, pressure will be OK because the compressor. Compressed liquid at high The pipe side to take into account the pressure drop from friction and. The vertical pipe in
the suction side piping on the placement Eva operator and condensers, as Leasing in different ways, as follows:
1. condensers, speeding over Eva enough operator
to make the runoff. Oil (Oil Trap) to make sure. Spent fuel will flow up to the compressor Sir making oil reservoirs should be close. Eva port operator as possible
2. When condensers, speeding over Eva operator to do enough to capture all the oil height of 4.5 m. In order to retain them in oil. The compressor starts again from the oil reservoir to lubricating oil is being sucked comments. Pressure immediately (Pipe should not exceed 15 m vertically.)
The piping for the cooling system exceeds 10 meters will have to add more lubricant. Offset the effects of oil residue inside surface of the tube. According to the following table for each 1 meter long walking fueling the view from OIL SIGHT GLASS (if any) in the range of 1/2 to 3/4 OIL SIGHT GLASS
pipe the gas to all. length 1 m
3/8 7.5 mm (c. C) 1/2 10 mm (c. C) 5/8 20 mm (c. C) 3/4 30 mm (c. C)
7/8 40 mm (. c. C) 1-1 / 8 50 mm (c. C)
When the piping through the wall, the wall. Should be wrapped with insulation or lining Which can reduce the vibration of the suction pipe must be insulated over the length of the pipe. Pipe insulation used must have at least 1/2 inch thickness typically do not need to send the pipe insulation. Unless the pipe through the area at high temperatures, such as boiler rooms or the hot sun. Insulation should be at least 3/8 inch thick encrustation of submission. And to increase the thickness of the insulation on the hood up with at least a 3/4 inch thick mounting sewer effluent that is the important part. If bad installation may result in water can not drain away and imprisoned. In the machine until it overflows external damage to the area around the machine. Sewer pipes are used by S-LON or PVC pipe from the machine by the operator's father. Sewers should be covered Insulating the area may have, especially if the condensate pipe in the ceiling Moreover sewer TRAP do with the air conditioning maintenance , air conditioning, to work efficiently and last longer, so be persistent. Regular maintenance care There is generally recommended to maintain the first. Regularly check and clean the air filter of the fan coil units every two weeks to two. Eva operator panel enough coils and condensers, coils should be cleaned 3-6 times per month 3. Fan motor and fan coil units, condensers, leasing unit must be checked every six months and lubricants. By grease or oil regularly 4. Check the water tray Cleaning so that the flow of water is completely gone 5. Check the wind direction out of the fan coil units. No material may be blocking the wind off the sixth. Check and repair insulation on the piping between the condensers, fan coil units and units totaled seven. Check windows and doors that leak heated air from the outside into the building? 8. Contact photographer trusted service to check at least 2 times a year to use air conditioning to save electricity use in homes or office buildings, approximately 60% will be applied to air conditioning system, if you use air conditioning at low efficiency or leave. heat up the room without. Users will need to produce more electricity than needed to pay for electricity for air conditioning that can be implemented in various ways, either way. Not having to invest And a small investment which results from operations will not be easy. Comfort from the air conditioning to be reduced, but will reduce the cost of electricity down from the usual way of saving is below a selection of air conditioning at the right one. Choose high-efficiency air conditioning was very cold, but the power consumption by the power consumption in watts. Or Amp or less, preferably chosen from the COP or EER (Energy Efficiency Ratio), which is the higher the better two. Choose the right size air conditioner with a third. Choose a thermostat or a thermostat probe with high precision, such as thermo-probe electronic type 4. Change air conditioning replacement air conditioning old low efficiency due to use for the replacement should be used with high efficiency to reduce heat from the exterior to reduce heat from the outside through an area which is conditioned by the wall. , roof and floor Consider the following: 1. Reduce the heat to pass through walls , glass walls 1.1 is one that can radiate heat from outside coming up. There are several ways to resolve 1.1.1.