Description
Description
EN 54E1 Rail
BS 80A Rail ( Supply By SRT)
Turnout 1:12 for EN 54E1 with Concrete Bearers
Turnout 1:10 for EN 54E1 with Concrete Bearers
Turnout 1:8 for EN 54E1 with Concrete Bearers
Monoblock Concrete Sleeper
Timber Sleeper
Fastening for Concrete Sleeper
Fastening for Timber Sleeper
EN 54E1 Compromise Rails 18.00 m long ( per pair )
BS 100A Compromise Rails 18.0 m long ( per pair )
BS 80A Compromise Rails 18.00 m long ( per pair )
Track Ballast
Glued Insulated Rail Joints and Installation
Concrete Panel Level Crossing and Installation
Lock Device for Turnout and Installation
Guard Rail on Steel Sleeper
Guard Rail on Concrete Sleeper
Fishplate Rail Joints
EN 54E1 Rails - Supply & Stack at SRT Depot
Monoblock Concrete Sleeper - Supply & Stack at SRT Depot
Fastening for above - Supply & Stack at SRT Depot
Fishplate Rail Joints BS 100A - Supply & Stack at SRT Depot
Track Ballast Suppy at SRT Depot
Tamping Machine
Switch and Crossing Tamping Machine
Ballast Regulation Machine
Track Recording Car
Stabilizer
Lay Plain Track for EN 54E1
Lay Plain Track for BS 100A
Lay Plain Track for BS 80A
Lay Compromise Rail
Lay Plain Track - Serviceable
Extra Over 8.301-8.302 in Existing Track
Installation of Turnout with Concrete Bearers ( EN 54E1 )
Installation of Turnout with Concrete Bearers ( BS100A )
Extra Over 8.306 & 8.307 Installation of Turnout in Existing Track
Provision and Installation of Buffer Stop Type 1
Provision and Installation of Buffer Stop Type 2
Spread and Compact Bottom Ballast ( 150 mm )
Spread Ballast , Level , Line , Tamp 1 st Lift ( 50 mm )
As Item 8.402 but to 2 nd Lift ( 50 mm )
Spread Ballast , Level , Line , Tamp Turnout 1 st Lift ( 50 mm )
As Item 8.404 but to 2 nd Lift ( 50 mm )
Dismantling Existing Track & Turnout ( Main Line )
Dismantling Existing Track & Turnout ( Siding Line )
Load up & Transport Existing Track Material to new site
Replace Sleeper & Fastening in existing Track
Realignment of Existing Track
Dismantle & Refurbish BS 100A T/O 1:12
Dismantle & Refurbish BS 100A T/O 1:10
Kilometer & Half Kilometer Posts
Clearance Marks
Shunt Limit Marks
Steel Sleeper
Fastening for Steel Sleeper
Lay Plain Track on Steel Bridge
DescriptionDescriptionEN 54E1 RailBS 80A Rail ( Supply By SRT)Turnout 1:12 for EN 54E1 with Concrete BearersTurnout 1:10 for EN 54E1 with Concrete BearersTurnout 1:8 for EN 54E1 with Concrete BearersMonoblock Concrete SleeperTimber SleeperFastening for Concrete SleeperFastening for Timber SleeperEN 54E1 Compromise Rails 18.00 m long ( per pair )BS 100A Compromise Rails 18.0 m long ( per pair )BS 80A Compromise Rails 18.00 m long ( per pair )Track BallastGlued Insulated Rail Joints and InstallationConcrete Panel Level Crossing and InstallationLock Device for Turnout and InstallationGuard Rail on Steel SleeperGuard Rail on Concrete SleeperFishplate Rail JointsEN 54E1 Rails - Supply & Stack at SRT DepotMonoblock Concrete Sleeper - Supply & Stack at SRT DepotFastening for above - Supply & Stack at SRT DepotFishplate Rail Joints BS 100A - Supply & Stack at SRT DepotTrack Ballast Suppy at SRT DepotTamping MachineSwitch and Crossing Tamping MachineBallast Regulation MachineTrack Recording CarStabilizerLay Plain Track for EN 54E1Lay Plain Track for BS 100ALay Plain Track for BS 80ALay Compromise RailLay Plain Track - ServiceableExtra Over 8.301-8.302 in Existing TrackInstallation of Turnout with Concrete Bearers ( EN 54E1 )Installation of Turnout with Concrete Bearers ( BS100A )Extra Over 8.306 & 8.307 Installation of Turnout in Existing TrackProvision and Installation of Buffer Stop Type 1Provision and Installation of Buffer Stop Type 2Spread and Compact Bottom Ballast ( 150 mm )Spread Ballast , Level , Line , Tamp 1 st Lift ( 50 mm )As Item 8.402 but to 2 nd Lift ( 50 mm )Spread Ballast , Level , Line , Tamp Turnout 1 st Lift ( 50 mm )As Item 8.404 but to 2 nd Lift ( 50 mm )Dismantling Existing Track & Turnout ( Main Line )Dismantling Existing Track & Turnout ( Siding Line )Load up & Transport Existing Track Material to new siteReplace Sleeper & Fastening in existing TrackRealignment of Existing TrackDismantle & Refurbish BS 100A T/O 1:12Dismantle & Refurbish BS 100A T/O 1:10Kilometer & Half Kilometer PostsClearance MarksShunt Limit MarksSteel SleeperFastening for Steel SleeperLay Plain Track on Steel Bridge
การแปล กรุณารอสักครู่..
