loading case. The 2:1 approximation and Fig. 4.16 (layered soil) provide about the same
answer, with the Newmark chart having the highest value of primary consolidation settlement. The amount of foundation settlement would probably vary from about 5 to 7.5 cm (2 to 3 in.), depending on the rigidity of the foundation and the actual variation of stress increase with depth.