If the result of evaluating the quality of the Supplier has been grade D monthly consecutive 3 months it must be filled in to improve the quality and the action plan for the prevention of loss of correction (8D Form) within 2 weeks after receiving assessment and quality assurance Department, after considering. The plan to improve the quality of the Supplier, the quality assurance Department to follow up the quality improvement by using the edit document, prevention of waste (Form 8D)
ผลลัพธ์ (ภาษาอังกฤษ) 2:
If the evaluation period, the Supplier D grades consecutive three months to complete, quality improvement and action plans to document protection measures to resolve the waste (8D Form) within two weeks after receiving the results of the evaluation. And after the Quality Assurance Department Supplier Quality Improvement Plan from the quality assurance department will then need to follow to improve the quality of the document editing waste prevention measures (8D Form).
ผลลัพธ์ (ภาษาอังกฤษ) 3:
If the monthly quality assessment of Supplier grade D 3 consecutive month. To fill and quality improvement action plan into a document, defensive measures solving waste (8D Form) within the 2.And after the quality assurance department considered. Quality improvement plan from the Supplier and quality assurance department will need to follow up the improvement of quality by using document measures, the protection of waste. (8D Form)