and length of the reactor (diameter, in case of circular reactor). The loading of biogas at gas-water interface should be kept less than 80 m3 gas/ m2.d (about 3 m/h). Initially the top width can be assumed as 0.3 m and for this width if the biogas loading is less than 3.0 m/h then adopt 0.3 m as top width.