Rig E-09 is planned to move to drill wells at location LKU-R ext by the end of this month. Construction team inform drilling team that there are no earth pit to contain water base mud waste on LKU-R location due to location space, but construction team provide earth pit on LKU-A location which is nearby LKU-R location for waste disposal.
Please propose support equipment to handle water base mud waste for rig E-09 during drilling operation on LKU-R. The distance from LKU-R to LKU-A location is less than 1 km.