Box Culvert Construction;
The Employer may consult with the Contractor to construct additional box culverts over the conveyor system at the Employer’s cost and expense. The Contractor shall submit the specifications, drawings, and the Contractor’s price proposal for the construction of such box culverts for the Employer’s approval prior to commencing the required construction, and the Employer shall respond with comments, approval or disapproval to the specifications, drawings, and pricing for the construction of such box culverts as submitted by the Contractor within thirty (30) days after submission.
The Contractor shall be responsible for maintaining at all times and in good condition of such facilities constructed including drainage ditches, site access road, box culvert throughout the Term.