Construction
The construction of the first three terminals began in 1970. Terminal 4 works commenced in 1974 and the port was expanded significantly with Terminals 5, 6, 7 and 8 by 1987. The River Trade Terminal construction was completed in 1999. Terminal 9 at Kwai Chung was constructed in 2004.