1 - Cylinder mat'l --> 2 draw => 1 draw -- the point of change: please describe. supplier , supplier of material or same supplier but the process is changing , we need more detail.
Answer : The point of change is “Changing the process”, supplier of material and supplier is current.
For parts below, the CKD is Japan side? Raw material and Supplier of item will be new, right?
2 - Base valve set pin --> CKD => LOCAL
3 - Base valve set pin ---> CKD => LOCAL
Answer : The CKD is Japan side, the point of change is supplier change from KYB Japan-> Local supplier. So, supplier of item will be new,
More detail, please see as attached file.
1 - Cylinder mat'l --> 2 draw => 1 draw -- the point of change: please describe. supplier , supplier of material or same supplier but the process is changing , we need more detail.Answer : The point of change is “Changing the process”, supplier of material and supplier is current.For parts below, the CKD is Japan side? Raw material and Supplier of item will be new, right?2 - Base valve set pin --> CKD => LOCAL3 - Base valve set pin ---> CKD => LOCALAnswer : The CKD is Japan side, the point of change is supplier change from KYB Japan-> Local supplier. So, supplier of item will be new,More detail, please see as attached file.