We would like to follow up the inspection jig 1st lot and 2nd as below.
1. 1st lot Gauge will go to CCS on 23 Sep 16
Purpose : 1.1 Co-Check to Confirm data and Inspection method
2. Arm and CV1 position is not follow drawing. Please repare and inspection finish before we visit.
3. 2nd lot please send drawing to us form confirm position ASAP
4. Please check drawing and 3D data if some diferrence. Let’s use 2D drawing.