The average cost of energy supplied (including electric power and thermal energy), the HRES costs USD 0.793/kWh and the BHIRES costs USD 0.656/kWh, with a cost reduction of 17.3%. This shows that the BHIRES introduced in this study can provide electric power and thermal energy at a lower cost than the wind/PV/ hydrogen HRES.