1. At 00 Grade parking level at least 4 permanent survey marks will be established within the ‘footprint’ of each tower. Block outs (150mm by 150mm) will be set in each slab vertically above the survey marks so that the control can be transferred directly to each level above using optical plumbing with the precision optical plumb.