Have you heard anything back from your engineering department?
I have been told by the frame engineer that the new EB3B bumper beam needs to be at Japan at the start of October. This would mean the part needs to be ready at the beginning of September. Doing a running change in time for the VP build is not feasible so I would request a soft tool quote for this part.
Volumes for VP at the moment are 45 A level assemblies and 80 C level assemblies.