43. The TOR, once finalized, would be used as basis for the tender document (RFP) which would be prepared by the to-be-appointed Consultant of ASEAN Connectivity through Trade and Investment (ACTI).
44. To facilitate the implementation of the ASW Pilot Project Component 2 (full-fledged), the Meeting agreed to establish a virtual working group comprising of national technical experts from Member States. In this regard, the Meeting noted the need to come up with a terms of reference to cover the scope and responsibilities of this virtual working group.
45. The Meeting noted that the Philippines would take the lead in drafting the terms of reference of the virtual working group for consideration of the TWG. The Philippines informed the Meeting that she would submit the draft terms of reference at the latest by 26 July 2013.