b) Costing from MHC team visit PFV
Costing team by Khun Artthasit visit PFV costing in Feb, the following are results, recommendations and topic to discuss.
• Results: Results of sampling check showed some high SOV came from non realistic yield, wrong decimal and wrong calculation.
• Recommendations:
Consideration to reduce standard yield of WCSF101-102 to reach the reality
Consideration to reduce standard operations of WCSF121-123 to reach the reality
Consideration yield WCSF121-123 has small averaged deviation (-0.40%) compare with 1. And 2.
Correct the decimal to be 4 digits.
Costing team of MCH is willing to supervise PFV to analyze SOV.
Naschaphat set weekly conference call with Ms. Lan in order to get points to improve internal controls and also release stress from working of Ms. Lan.