To start the Setup Equipment on Casio has been received by the Supplier is required to verify that the machine tool can be used or not. And the History Tool in Machine Master List and label control to the regulations, including the preservation and newcomers in the Equipment Room and planned calibration coupled with the IE. Need to plan . Line Layout by placing the machine tool to the real space . Through the cooperation of many parts . The department of PE. Would divide the work into three sections: New Model Section, IE Section, Machine Section to divide the work and mobility in the workplace. Each part will work all the time. In order to .