The capacity to increase pH of
the solution is an important factor to control the period of slag
replacement. Barca et al. (2012) reported that the dissolution of
lime (CaO) in the slag leads the increase of the solution pH, and
thus, it is believed that the depletion of CaO caused the shorter
replacement period of the slag