9% of Costs as adjusted in accordance with the provisions of the Contract
The Employer reserves the right to directly procure any equipment/materials and make arrangements for the Contractor to take deliveryon site for the contractor’s installation works. A 5% Contractor's Fee shall be imposed on the cost of such direct equipment/materials procured by the Employer up to a maximum of 25% of the value of equipment/materials described in the BoQ.
Any other equipment/materials proposed to be directly procured by the Employer over and above the maximum 25% value shall be subject to 9% Contractor's Fee.