An extra precaution here might be to install a tee at the low point(s) in the hydraulic supply line with a 1/4" bleed valve. After the supply line is turned off each fall, open this bleed valve for a few seconds to release pressure on the supply line. Then close it immediately before muddy water can run back into the line.