• Khun Suphot informs have the emergency and backup light on the drawing.
• Khun Suphot informs have the overhead reading lamp on the drawing.
• Khun suphot will send revise the drawing for show lighting switch on the lighting layout drawing.
• Elecon can be grouped thermostat control by one thermostat in the same room and Khun Suphot will determine the position for installation.
• Check and add thermostat is missed in the area of fitness room in Presidential Suite on the drawing.
• Water hose near W.C. will be installed by hotel engineer.
• Khun Suphot will add the sprinkler in the area of bar and foyer of bedroom in the Diplomatic Suite on drawing.
• Speaker not is located above the bed but above the ceiling, Khun Suphot will add note on the drawing.
• Khun Suphot informs have speakers on the combined ceiling plan of Diplomatic Suite and Presidential Suite.
• Elecon will summit the quotation for installation RCU control due to the existing quotation has only material cost.