10.11 Penalty table
No. Violation Penalty
1 To drop a fastener (bolt, nut, washer) (2.8) 5 sec
2 To drop a fastener tool (spanner, wrench, ratchet) (2.8) 10 sec
3 To drop a bridge member (2.8) 20 sec
4 To drop a unit of connected bridge members.
A group of connected bridge members must be held by one or some constructors if the chain of bridge members is unstable. 20 sec
5 To throw a bridge member, tool, nut or a bolt (5.4) 20 sec
6 A constructor enters to the river
To touch or step the river boundary is regarded as an entry to the river. (2.8) 5 sec
7 A constructor carries multi bridge members.(5.4) Return back to the staging yard
9 A hinged member exists.(2.4) +20kgf
10 A screwed or tapped member exists (2.7) 30 sec
11 A bolt or nut preliminarily attached to the bridge member by welding exists and make them tight.(2.7) 20 sec
12 Bridge width violates its regulation (2.1) +10 kgf
13 A constructor conducts assembly works without self-support. (another constructor sustains his or her arm or body) (5.5) Judges warn the constructor to stop it.
14 A bolt or nut is not separated from bridge members before the construction starts. (5.3) 10 sec
15 A colored bolt or nut is tightened. (5.5) 10 sec
16 A ready-component bolt or nut is not colored. (2.5) 20 sec
17 Vehicle running space is not provided. (2.9) +10kgf
18 Floor beams are not equipped in the loading area. (2.3) +15kgf
19 Repair works after the timed construction (5.7)
Add (time for modification) * 1.5
20 Gloves do not cover the whole fingers (5.3) 10 sec per constructor
21 Size of bridge member violation (10.1) Additional weight penalty given
22 Bridge clearance violation (10.5) Additional weight penalty given
23 Not enough space to install loading plate (10.7) +5kgf
24 Bridge length violation (10.8) Additional weight penalty given
26 A constructor does not wearing gloves, helmets, or goggles (10.9) 10 sec per equipment