Clarification No.3: Power management of string inverter
The Bidder shall provide the power management to string inverter, in case of the power generated from the PV systems exceed actual load required by sites, in order to keep the power generated from the PV systems lower than the actual load required by sites while keeping PEA/MEA connectivity.