In the ROAD project the issue of phase change prevention is solved by designing the transport
infrastructure is such away that the CO2 is kept in a supercritical state during transportation and injection. Phase change is thus prevented. This solution can only be expected to be considered if transportation distances are short enough. No exact cost effects for added insulation are known at this point in time but are estimated to be between 15 and 25%.