For project having two AFC issuances such as "Short-term" and "Long-term", TET shall determine which drawings require two AFC issuances, then CDO/DO will provide 2 revision numbers to be used for "Short-term" and "Long-term" issuance. Such drawings requiring 2 AFC issuances shall be clearly indicated in the DRF during drawing requisition. This is also applicable for projects where drawings require additional AFC design for "shut-down work" during project execution.