Good morning Ananya San,
His experience for SPP is quite acceptable for it, but not hydropower.
SPP experiences are quite limited as power generation engineering because it is designed as one of completed system and compact.
However he is electrical engineer, therefore, he have possibility to adjust him as hydropower engineer but certain period is needed.
Off cause he is suitable for BIC if required.
See you on 15th, to find best process.