To record the safe conditions of each lifting equipment, a pre-shift inspection should be implemented. The inspections should be delivered conducted before each shift by the user of the equipment. Check list should identify the items which should be checked before the usage, clearly indicating the items which require immediate fixes prior to use, and items that can be fixed after use. The inspection shall be documented and maintained for at least one week