3 months (including the month in which maintenance occurs) is expected. The repair cost in the local shop is $120 per component. At the central facility, the cost is only $35 per component. An overhauled component used in a later month will incur an additional storage cost of $1.50 per unit per month. New components may be purchased at $200 each in month 1, with a 5% price increase every 2 months. Formulate the problem as a transportation model, and determine the optimal schedule for satisfying the demand for the component over the next six months.