Step i. For this system assembly, drawing labelled: 7866-OL-DOC-01 is recommended to be used. The suction cart will not be incorporated within this system tests (assembling of pieces will comprehend from 1.01 to 1.10 of the specified drawing). The income of the cart will be held later, when the lagoon have operational water level (Please see the box below).