MOVE AND INSTALLATION PRESS MACHINE 85 TONS
- LOAD THE MACHINE DOWN FROM TRAILER
- MOVE PRESS MACHINE INTO THE LAYOUT
- ASSEMBLY PART
EQUIPMENT USED IN THE INSTALLATION MACHINE
- USED CRANE 200 TONS 1 M/C
- USED FORKLIFL 20 TONS 2 M/C
PREPARATION OF THE AREA TO WORK
- REMOVE AND DISMANTLE THE PIPE
- DISMANTLING THE CEILING ABOVE THE ENTRANCE TO THE FACTORY
*Remark : Conditional payment upon approval under the pay 30%
remaining 70% is credit