process : while opening mould,enter slow mould opening first and then switches to fast mould opening when stroke arrives at 50.5 mm,and then switches to middle speed mould opening when arrives at 215.5 mm ,and then switches to low speed mould opening when arrives at 550.8 mm and then mould opening completed when arrives at 600 mm