In this design procedure first priority is given for maintaining maximum possible COD conversion efficiency of the reactor, by selecting proper loading conditions for that COD concentrations, and then to try for minimizing cost of the reactor. For given COD concentration of the wastewater maximum possible loading rates are used in the beginning and reduced in steps till the design satisfies all the requirements. Thus, this design will provide minimum volume of the reactor satisfying all design recommendations.