It has become somewhat evident that there is a problem with the structure at the 9th floor to 12th floor areas at the South elevation of the roof system; please refer to the attached digital photograph of which is self-explanatory, and it is also noted that TSS has proceeded with the installation of the BEMO roof system at this location as can be seen from the attached photo, However the problem with the structure must be addressed accordingly.