C RTIFICATE OF PRACT CAL COMPLETION
(Nominated Su contract)
The Project: THE MO TGOMERIE LINKS VIETNAM
THE CLUB HOUSE (M & E WORKS)
Contract Agreement between:
The Contractor: LIGHTHOUSE JOINT STOCK COMPANY
(Hereinafter referred to as the Main Contractor)
Nominated Subcontractor: INTECH CORPORATION (INDUSTRIAL TECHNIQUE CORPORATION)
(Hereinafter referred to as the Nominated Subcontractor)
The Client: INDOCHINA HOI AN GOLF COURSE JOINT STOCK COMPANY
(Hereinafter referred to as the Client)
Contract Reference: MLV-CLHSE-LJSC-09-04N dated 06 June, 2009
For the work known as:
CONSTRUCTION OF THE mo STOREY CLUB HOUSE M & E SERVICES AND
ASSOCIATED WORKS
Reference to the contract agreement between Light House Joint Stock Company and Intech
Corporation for the Construction of the Two Storey Club House M & E Services and Associated
Works and further reference to the Certificate of Practical Completion issued by the Construction
Manager (Delta Construction Management Company) concurred by the Client (Indochina Hoi An Golf
Course JSC) dated 21 August, 2009.
Based on the Construction Managers Certificate of Practical Completion, we, Light House Joint Stock
Company, hereby acknowledge that the work performed under this Contract is substantially complete
in accordance with the terms of contract agreed upon by and between Lighthouse Joint Stock
Company (the Main Contractor) and Intech Corporation (the nominated sub-contractor), so that
Indochina Hoi An Golf Course JSC (the client) can take over, occupy and utilize the Club House for its
th
intended purpose. The date of Certificate of Practical Completion is on the 18 of August, 2009.
SUbject to the completion of the "Defect List" (as per Appendix 1), Indochina Hoi An Golf Course JSC
(the Client) to issue a formal "Taking Over Certificate", which is also the date of commencement of
applicable warranties required by the Contract.
This Practical Completion Certificate shall not relieve Intech Corporation of its contractual obligation
for any items that may be found defective within the guarantee period. This Certificate is not
considered an acceptance of any works or materials by Indochina Hoi An Golf Course JSC (the
Client).
Certified by:
For and In Behalf of the Main Contractor:
LIGHT HOUSE JOINT STOCK COMPANY
There are numbers of items of works/documentations, referred as "Defect list" (refer to Appendix 1)
that are outstanding and are required to be completed prior to the issuance of the Taking Over
Certificate.
Failure to include any defects and outstanding works in the list, does not alter the responsibility of the
Nominated Sub-contractor to complete work in accordance with the Contract Conditions.
The Nominated Sub-contractor to rectify and complete all items as listed on the "Defect list" within
Fifteen (15) days from the date of issuance of thi s 'Certificate of Practical Completion'. Any
outstanding work that are not completed within the specified date, Indochina Hoi An Golf Course (the
Client) to assign Trade Contractors to rectify the works and all associated cost of rectifying and
completing the defects and outstanding work shall be charged against any amounts due to Lighthouse
Joint Stock Company (the Main Contractor) and Intech Corporation (the Nominated SUb-contractor).
The Client's taking over the works of Main Contractor and the Nominated Sub-contractor shall not
relieve the Contractor respective responsibilities to warrant the works carried out by the appointed
trade contractor or workers by the Client.
For and In Behalf of the Contractor; For and In Behalf of the Nominated SUb-contractor
LIGHTHOUSE JOINT STOCK COMPANY
MR. TRANH ANH KHOA
Project Director
Based on the Certificate of Practical Completion issued dated 21 August, 2009, we, Delta
Construction Management Company Ltd, Certifies that the Work is Practically Complete.
For and in Behalf of the Construction Managers;
DELT~~GEMENTCOMPANV
MR. NGtlYEN HONG MINH
Construction Manager
The Client accepts the works as practically completed:
The Contractor/Nominated Sub-contractor will complete or correct the defects or outstanding works as
Ilsted above within the specified date to a maximum of Fifteen (15) days of the date of issuance of the
"Certificate of Practical Completion". Any outstanding work not completed within the time allowed above
shall be completed by Client and the cost of completing such defects or outstanding works shall be
charged against any amounts due Contractor. Employer's taking over the works of Contractor shall not
relieve the Contractor of his responsibillties to warranty the works carried out by the Employer/Owner.
For and in behalf of the Contractor For and in behalf of the Nominated Sub-contractor
L1GHHOUSE JOINT STOCK COMPANY:
TRAN ANH KHOA
Project Director
For and in behalf of the Construction Managers
DELTA CONSTRUCTION MANAGEMENT COMPANY:
NGUYEN::HO'NG MINH
Construction Manager
CERTIFICATE OF COMPLETION -CONTRACT CONSTRUCTION
I, the undersigned Architect or Engineer of the following Rural Utilities Service project, do hereby certify that:
1. The construction provided for pursuant to Construction Contract No. ,
dated , 20 , including all approved amendments, between
, RUS designation (''Owner'')
and (''Contractor'')
has been completed as of , 20 , and is in compliance with the
provisions of the Construction Contract, including all plans, specifications, maps, and drawings and all
modifications thereof.
2. Payment in full has been made to all persons who have furnished labor for the Project.
3. The Contractor has obtained valid releases of lien from all manufacturers, material suppliers, and
subcontractors furnishing services or materials which were employed by the Contractor in the performance of
the Construction Contract, and that such releases have been delivered by the Contractor to the Owner.
4. If applicable, the Final Inventory attached hereto and made a part hereof is a complete and accurate summary
of all units of construction in the project and of all work performed in accordance with the Construction
Contract.
5. If applicable, the staking sheets and tabulation of staking sheets upon which the Final Inventory is based show
the accurate location, number, and kind of all units of construction of the project and show all work performed
in accordance with the Construction Contract.
6. All defects in workmanship and materials reported during the period of construction of the project have been
corrected.
7. The total cost of the project as completed is
dollars and cents ($ ).
Dated this day of ,20
We. the undersigned Owner and Contractor, do hereby certify that:
1. The Project has been completed in accordance with the provisions of the Construction Contract, dated
, 20 , provided, however, that acceptance of the project by the
Owner shall not be deemed to relieve the Contractor of its obligations contained in the Construction Contract
with respect to defective workmanship or, materials discovered within one year after the date of completion.
2. If applicable. the Final Inventory attached hereto and made a part hereof is a complete and accurate summary
of all units of construction in the Project and of work performed in accordance with the Construction Contract.
C RTIFICATE ของ PRACT CAL COMPLETION
(เสนอชื่อเข้าชิงซูสัญญา) โครงการ: MO TGOMERIE ลิงค์เวียดนามCLUB HOUSE (M & E WORKS) ข้อตกลงสัญญาระหว่าง: เหมา: LIGHTHOUSE ร่วมทุน(ต่อไปนี้จะเรียกว่าเป็นผู้รับเหมาหลัก) เสนอชื่อเข้าชิงผู้รับเหมาช่วง : อินเทคคอร์ปอเรชั่น (เทคนิคอุตสาหกรรม CORPORATION) (ต่อไปนี้เรียกว่าผู้รับเหมาช่วงเสนอชื่อเข้าชิง) ลูกค้า: INDOCHINA หอยสนามกอล์ฟร่วมทุน(ต่อไปนี้เรียกว่าลูกค้า) สัญญาอ้างอิง: MLV-CLHSE-LJSC-09-04N ลงวันที่ 06 มิถุนายน 2009 สำหรับการทำงานที่เรียกว่า: การก่อสร้างบ้านเดี่ยวชั้นเดียวโม CLUB HOUSE M & E บริการและร่วมทำงานการอ้างอิงถึงข้อตกลงสัญญาระหว่าง Light House บริษัท ร่วมหุ้นและอินเทคคอร์ปอเรชั่นเพื่อการก่อสร้างของคลับเฮ้าส์ชั้น M & E บริการสอง และที่เกี่ยวข้องธิการและการอ้างอิงต่อไปรับรองเสร็จการปฏิบัติที่ออกโดยการก่อสร้างManager (Delta บริษัท บริหารงานก่อสร้าง) เห็นด้วยโดยลูกค้า (อินโดจีนฮอยอันกอล์ฟหลักสูตร JSC) ลงวันที่ 21 สิงหาคม 2009 อยู่บนพื้นฐานของผู้จัดการการก่อสร้างที่แล้วเสร็จรับรองการปฏิบัติ เรา Light House ร่วมหุ้นบริษัท ขอยอมรับว่างานที่ดำเนินการภายใต้สัญญานี้เสร็จสมบูรณ์อย่างมีนัยสำคัญให้สอดคล้องกับเงื่อนไขของสัญญาที่ตกลงกันและระหว่างประภาคารร่วมหุ้นบริษัท (ผู้รับเหมาหลัก) และอินเทคคอร์ปอเรชั่น (ย่อยเสนอชื่อเข้าชิง ผู้รับเหมา) เพื่อให้อินโดจีนฮอยอันกอล์ฟ JSC (ลูกค้า) สามารถใช้เวลามากกว่าครอบครองและใช้ประโยชน์จากคลับเฮ้าส์สำหรับวันที่วัตถุประสงค์ที่ตั้งใจไว้ วันที่มีการรับรองการปฏิบัติเสร็จเป็นที่ 18 สิงหาคม 2009 เรื่องจะเสร็จสิ้นของ "ข้อบกพร่องลิสต์" (ตามภาคผนวก 1) อินโดจีนฮอยอันกอล์ฟ JSC (ลูกค้า) ที่จะออกอย่างเป็นทางการ "Taking Over รับรอง "ซึ่งเป็นวันที่เริ่มต้นของการรับประกันสามารถใช้งานได้ตามสัญญานี้เสร็จรับรองการปฏิบัติจะไม่บรรเทาอินเทคคอร์ปอเรชั่นข้อผูกพันตามสัญญาของรายการใด ๆ ที่อาจจะพบว่ามีข้อบกพร่องภายในระยะเวลารับประกัน รับรองนี้ไม่ได้รับการพิจารณาได้รับการยอมรับในผลงานใด ๆ หรือวัสดุที่อินโดจีนโดยฮอยอันกอล์ฟ JSC ( ลูกค้า) ได้รับการรับรองโดย: สำหรับและในนามของผู้รับเหมาหลัก: บ้าน LIGHT บริษัท ร่วมทุนมีจำนวนของรายการผลงาน / เอกสารเป็น , เรียกว่า "รายการข้อบกพร่อง" (โปรดดูภาคผนวก 1) ที่มีความโดดเด่นและมีความจำเป็นที่จะต้องทำให้เสร็จก่อนที่จะมีการออกพาไปรับรองความล้มเหลวที่จะรวมถึงข้อบกพร่องใด ๆ และผลงานที่โดดเด่นในรายการที่ไม่ได้เปลี่ยนแปลงความรับผิดชอบของย่อยผู้รับเหมาเสนอชื่อเข้าชิงเพื่อการทำงานให้สอดคล้องกับเงื่อนไขสัญญาเสนอชื่อเข้าชิงย่อยผู้รับเหมาเพื่อแก้ไขและดำเนินการทุกรายการตามที่ระบุไว้ในรายการ "บกพร่อง" ภายในสิบห้า (15) วันนับจากวันที่ออกใบสำคัญแสดงสิทธิของรัชกาลที่ s 'รับรอง ของการปฏิบัติเสร็จ ' ใด ๆ ที่ทำงานที่โดดเด่นที่ไม่ได้ให้แล้วเสร็จภายในวันที่ระบุอินโดจีนฮอยสนามกอล์ฟ ( ลูกค้า) ที่จะกำหนดให้ผู้รับเหมาการค้าในการแก้ไขการทำงานและค่าใช้จ่ายที่เกี่ยวข้องในการแก้ไขและการกรอกข้อบกพร่องและการทำงานที่โดดเด่นจะได้รับการหักออกจากจำนวนเงินใด ๆ ที่เกิดจากการ ประภาคารบริษัท ร่วมหุ้น (ผู้รับเหมาหลัก) และอินเทคคอร์ปอเรชั่น (ผู้รับเหมาเสนอชื่อเข้าชิง) การของลูกค้าในช่วงการทำงานของผู้รับเหมาหลักและเสนอชื่อเข้าชิงย่อยผู้รับเหมาจะไม่บรรเทาเหมารับผิดชอบตามลำดับที่จะรับประกันผลงานที่ดำเนินการโดย ได้รับการแต่งตั้งผู้รับเหมาการค้าหรือคนงานโดยลูกค้าสำหรับและในนามของผู้รับเหมา; และในนามของการเสนอชื่อผู้รับเหมาย่อยบริษัท ร่วมทุน LIGHTHOUSE MR Tranh ANH khóa ผู้อำนวยการโครงการบนพื้นฐานของการรับรองการปฏิบัติเสร็จออกลงวันที่ 21 สิงหาคม 2009 เราเดลต้าบริหารงานก่อสร้าง บริษัท จำกัด รับรองว่าการทำงานเป็นจริงที่สมบูรณ์แบบสำหรับและในนามของผู้จัดการก่อสร้างDELT ~ ~ GEMENTCOMPANV MR NGtlYEN HONG มินห์ก่อสร้างผู้จัดการลูกค้ายอมรับผลงานที่เสร็จสมบูรณ์จริง: เหมา / เสนอชื่อเข้าชิงย่อยผู้รับเหมาจะเสร็จสมบูรณ์หรือแก้ไขข้อบกพร่องหรืองานที่โดดเด่นเป็นIlsted ข้างต้นภายในวันที่กำหนดได้สูงสุดสิบห้า (15) วันนับจากวันที่ การออก"รับรองการปฏิบัติเสร็จ" การทำงานที่โดดเด่นใด ๆ ที่ไม่เสร็จสมบูรณ์ภายในระยะเวลาที่ได้รับอนุญาตดังกล่าวข้างต้นให้แล้วเสร็จโดยลูกค้าและค่าใช้จ่ายในการดำเนินการข้อบกพร่องดังกล่าวหรืองานที่โดดเด่นจะได้รับการหักออกจากจำนวนเงินที่ผู้รับเหมาเนื่องจากใด การประกอบการในช่วงการทำงานของผู้รับเหมาจะไม่บรรเทาเหมาของ responsibillties ของเขาที่จะรับประกันผลงานที่ดำเนินการโดยผู้ประกอบการ / เจ้าของสำหรับและในนามของผู้รับเหมาสำหรับและในนามของผู้รับเหมาย่อยเสนอชื่อเข้าชิงL1GHHOUSE บริษัท ร่วมทุน: TRAN ANH khóa ผู้อำนวยการโครงการสำหรับและในนามของผู้จัดการก่อสร้างDELTA บลจก่อสร้างเหงียนมินห์ :: HO'NG ก่อสร้างผู้จัดการประกาศนียบัตรของสิ่งก่อสร้างเสร็จสัญญาผมสถาปนิกหรือวิศวกรนามของโครงการชนบทบริการสาธารณูปโภคต่อไปนี้ไม่ขอรับรอง ที่: 1 การก่อสร้างให้เป็นไปตามสัญญาจ้างเหมาก่อสร้างเลขที่, วันที่, 20, รวมทั้งการแก้ไขทั้งหมดได้รับการอนุมัติระหว่าง, มาตุภูมิกำหนด ('' เจ้าของ'') และ (เหมา'''') ได้รับการเสร็จสิ้น ณ , 20, และอยู่ใน การปฏิบัติตามบทบัญญัติของสัญญาการก่อสร้างรวมทั้งแผนทั้งหมดรายละเอียดแผนที่และภาพวาดและการปรับเปลี่ยนดังกล่าว2 ชำระเงินเต็มได้รับการสร้างขึ้นมาเพื่อทุกคนที่ได้รับการตกแต่งแรงงานสำหรับโครงการ3 ผู้รับเหมาได้รับการเผยแพร่ที่ถูกต้องของภาระจากผู้ผลิตทั้งหมด, ผู้ผลิตวัสดุและผู้รับเหมาตกแต่งบริการหรือวัสดุที่ได้รับการว่าจ้างจากผู้รับเหมาในการปฏิบัติงานของสัญญาการก่อสร้างและที่เผยแพร่ดังกล่าวได้รับการจัดส่งโดยผู้รับเหมาที่เจ้าของ4 . ถ้ามีสินค้าคงคลังสุดท้ายท้ายพระราชบัญญัตินี้และเป็นส่วนหนึ่งของหนังสือฉบับนี้เป็นบทสรุปที่สมบูรณ์และถูกต้องของทุกหน่วยงานของการก่อสร้างในโครงการและงานทั้งหมดที่ดำเนินการให้สอดคล้องกับการก่อสร้างสัญญา5 ถ้ามีแผ่นพนันและการจัดระเบียบแผ่นพนันซึ่งสินค้าคงคลังขั้นสุดท้ายจะขึ้นแสดงตำแหน่งที่ถูกต้องจำนวนและชนิดของทุกหน่วยงานในการก่อสร้างของโครงการและแสดงผลงานทั้งหมดที่ดำเนินการตามสัญญาก่อสร้าง6 ข้อบกพร่องทั้งในฝีมือและวัสดุที่รายงานในช่วงเวลาของการก่อสร้างของโครงการที่ได้รับการแก้ไข7 ค่าใช้จ่ายทั้งหมดของโครงการที่เสร็จสมบูรณ์เป็นดอลลาร์และเซนต์ ($) ลงวันที่วันนี้, 20 เรา เจ้าของนามและผู้รับเหมาไม่ขอรับรองว่า: 1 โครงการที่ได้รับการเสร็จสิ้นตามบทบัญญัติของการก่อสร้างตามสัญญาลงวันที่20 ให้ แต่การยอมรับของโครงการโดยที่เจ้าของมิใช่เพื่อบรรเทาเหมาภาระหน้าที่ของตนที่มีอยู่ในสัญญาการก่อสร้างที่เกี่ยวกับการ ฝีมือชำรุดหรือวัสดุที่ค้นพบภายในหนึ่งปีนับจากวันที่เสร็จสิ้น2 หากสามารถใช้งานได้ สินค้าคงคลังสุดท้ายท้ายพระราชบัญญัตินี้และเป็นส่วนหนึ่งของหนังสือฉบับนี้เป็นบทสรุปที่สมบูรณ์และถูกต้องของทุกหน่วยงานของการก่อสร้างในโครงการของการทำงานและการดำเนินการตามสัญญาก่อสร้าง