To construct a petanque piste that is satisfactory to play on in all seasons it is first necessary to select a reasonably well drained area.
The topsoil should be removed to a depth of 6-8 inches (150 - 200 mm) and a layer of hard-core, brick rubble, stone etc. laid in the bottom. This should be compacted down to approx. 4 inches (100 mm) thick using a Wacker plate or Roller. The area can now be filled with crushed quarry stone 1 1/2 inch down to dust all in. This is known as type 1 sub base or scalpings. A heavy roller over this, if it is not too dry, will provide a hard firm surface. However, if played on at this stage the large stones will come to the surface. The area will need subsequent rolling and watering to settle the stones down. A shower of rain (hose pipe ) will be beneficial.